欧美军警gay巨大粗长,国产大片资源中文字幕,午夜亚洲国产理论片2020,亚洲色少妇熟女11p

歡迎進(jìn)入山東恒能環(huán)保能源設(shè)備有限公司

熱線電話(huà)

0531-69953988

分類(lèi)導(dǎo)航
產(chǎn)品展示
聯(lián)系我們
山東恒能環(huán)保能源設(shè)備有限公司

聯(lián)系電話(huà):18678860671

服務(wù)熱線:0531-69953988

聯(lián)系地址:中國(guó)(山東)自由貿(mào)易試驗(yàn)區(qū)濟(jì)南片區(qū)孫村街道經(jīng)十東路33688號(hào)章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號(hào)樓 101

沼氣凈化脫硫裝置的運(yùn)行維護(hù)!

沼氣凈化裝置的運(yùn)行維護(hù)應(yīng)符合下列規(guī)定:

The operation and maintenance of biogas purification device shall meet the following requirements:
1、應(yīng)定期排出脫水、脫硫裝置中的領(lǐng)凝水。當(dāng)室外溫度接近0℃時(shí),應(yīng)每天排除冷凝水,排水時(shí)應(yīng)防止沼氣泄漏。
1. The condensate water in dehydration and desulfurization unit shall be discharged regularly. When the outdoor temperature is close to 0 ℃, the condensate water should be drained every day, and the leakage of biogas should be prevented during drainage.
2、生物脫硫啟動(dòng)運(yùn)行正常后,應(yīng)定期檢查脫硫前后硫化氫濃度變化,硫化氫去除率應(yīng)滿(mǎn)足后端工藝要求。當(dāng)發(fā)現(xiàn)脫硫效率明顯下降時(shí),應(yīng)及時(shí)補(bǔ)充循環(huán)營(yíng)養(yǎng)液。塔內(nèi)填料應(yīng)6-12個(gè)月清洗1次。
2. After the start-up and operation of biological desulfurization are normal, the change of hydrogen sulfide concentration before and after desulfurization should be checked regularly, and the hydrogen sulfide removal rate should meet the requirements of back-end process. When it is found that the desulfurization efficiency is obviously decreased, the circulating nutrient solution should be supplemented in time. The packing in the tower should be cleaned once every 6-12 months.
3、應(yīng)定期檢查干法脫硫塔前后硫化氫濃度、沼氣壓力變化,當(dāng)達(dá)不到設(shè)計(jì)要求時(shí)應(yīng)更換脫硫劑或進(jìn)行脫硫再生。
3. The change of hydrogen sulfide concentration and biogas pressure before and after the dry desulfurization tower should be checked regularly. When the design requirements are not met, the desulfurizer should be replaced or the desulfurization regeneration should be carried out.
                       沼氣脫硫
4、干法脫硫塔再生應(yīng)符合下列規(guī)定:
4. Regeneration of dry desulfurization tower shall meet the following requirements:
1).當(dāng)采用塔內(nèi)脫硫劑再生時(shí),應(yīng)關(guān)閉沼氣進(jìn)出口閥,打開(kāi)旁通管道和放散管路閥門(mén)。
1) When the desulfurizer in the tower is used for regeneration, the inlet and outlet valves of biogas should be closed, and the valves of bypass pipeline and discharge pipeline should be opened.
2).當(dāng)采用在線脫硫劑再生時(shí),應(yīng)根據(jù)沼氣中硫化氫含量確定空氣摻混量及空氣流速,塔內(nèi)溫度應(yīng)低于70℃,脫硫塔出口處沼氣中氧含量應(yīng)小于1%;
2) When online desulfurizer regeneration is used, the air mixing amount and air flow rate should be determined according to the content of hydrogen sulfide in biogas. The temperature in the tower should be lower than 70 ℃, and the oxygen content in biogas at the outlet of desulfurization tower should be less than 1%;
3).脫硫劑進(jìn)行2次~3次再生后應(yīng)及時(shí)更換,更換脫硫劑時(shí)操作人員應(yīng)戴防毒面具,室內(nèi)應(yīng)進(jìn)行通風(fēng);
3) The desulfurizer should be replaced in time after 2 ~ 3 times of regeneration. When replacing the desulfurizer, the operators should wear gas masks, and the room should be ventilated;
4).廢脫硫劑的處置應(yīng)符合環(huán)境保護(hù)的要求。
4) The disposal of waste desulfurizer should meet the requirements of environmental protection.

相關(guān)產(chǎn)品 我們的存在,是為了更好的服務(wù)于沼氣等可燃?xì)怏w凈化及利用行業(yè)
国产精品美女久久久网av| 国内精品久久久久影院一蜜桃| 国产成人精品a视频| 办公室美妇疯狂叫声浪吟| 亚州av综合色区无码一区| 狠狠躁夜夜躁人爽碰| 国外网站大全| 人妻少妇精品视频三区二区一区| 色妺妺av欧ooxxooxx| 国产精品久久久久久久9999| 久久人人爽爽爽人久久久| 成人乱码一区二区三区av| 国产SUV精品一区二区88L| 久久久久人妻精品一区三寸蜜桃| 成人男女av片在线观看| yy4080旧里番未删减版| 入禽太深免费完整版电影| 日本极度色诱| 玩两个丰满老熟女在线视频| 口述他用舌头给我添高潮| 韩国高清大片免费观看在线| 99久久精品无码一区二区毛片| 国产综合精品一区二区三区| 同性双男a片又黄又刺激小说免费| 清纯校花自慰呻吟流白浆| 无码永久成人免费视频| 两个人免费视频| 在野外被4个男人躁一夜| 和搜子居同的日子hd高清看| 我的邻居是bj无删减漫画免费看| 久久超级碰碰人妻人人妻| 成熟女人特级毛片WWW免费| 亚洲熟妇无码av在线播放| 国产精品18久久久久久vr| 苏桃的骚乱文肉np| 色婷婷亚洲精品天天综合影院| 欧美午夜精品久久久久免费视| 夜夜躁狠狠躁日日躁视频| 一下子就弄进去了岳| 国产精品亚洲成在人线| 18无码av精品一区二区三区|