生物脫硫設備冷卻塔的安裝

1.冷卻塔安裝要求

1. Installation requirements of cooling tower
(1)冷卻塔的安裝應根據(jù)設備的各種條件,考慮其安裝位置的地面及其荷載能力,同時也考慮外界條件。
(1) The installation of the cooling tower shall consider the ground and its load capacity at the installation location as well as the external conditions according to various equipment conditions.
(2)安裝時應注意冷卻塔的基礎按規(guī)定的尺寸預埋好水平鋼板,各基礎點的標高應在同一標高的水平面上。
(2) During installation, it shall be noted that the horizontal steel plate shall be embedded in the foundation of the cooling tower according to the specified size, and the elevation of each foundation point shall be on the horizontal plane of the same elevation.
(3)塔體應放置水平。水塔在施工安裝時,為防止壓壞底盤,施工人員應踏在底盤的加強筋上,在安裝塔外殼、底盤等纖維件時,為防止外殼底盤等變形可先穿螺釘,而后依次逐漸緊固,在確認底盤不變形,附近干凈、干燥的條件下,為避免使用時漏水可在接觸處鋪設纖維氈及涂樹脂。
(3) The tower body shall be placed horizontally. During the construction and installation of the water tower, in order to prevent crushing the chassis, the construction personnel should step on the reinforcing ribs of the chassis. When installing the tower shell, chassis and other fiber parts, in order to prevent the deformation of the shell and chassis, the screws can be threaded first, and then the screws can be tightened gradually. After confirming that the chassis is not deformed, and the surrounding area is clean and dry, the fiber felt and resin can be laid at the contact point to avoid water leakage during use.
2.冷卻塔本體安裝
2. Installation of cooling tower body
冷卻塔不得安裝在通風不良和出現(xiàn)濕空氣回流的場合,須安裝在通風良好的場所。否則將會降低冷卻塔的冷卻能力。冷卻塔一般安裝在冷凍站的屋頂上,以形成高壓頭,用以克服冷凝器的阻力損失。水泵將需要處理的冷卻水從水池抽出送至冷卻塔,經(jīng)冷卻降溫后從塔底集水盤向下自流壓入冷凝器中,并繼而靠水頭壓差自流入水池,如此循環(huán)。
The cooling tower shall not be installed in the place with poor ventilation and wet air return, but in the place with good ventilation. Otherwise, the cooling capacity of the cooling tower will be reduced. The cooling tower is generally installed on the roof of the refrigeration station to form a high-pressure head to overcome the resistance loss of the condenser. The water pump pumps the cooling water to be treated from the pool to the cooling tower. After cooling, it flows down from the water collecting tray at the bottom of the tower to the condenser automatically, and then flows into the pool automatically by the head pressure difference, so as to circulate.
安裝時,應根據(jù)施工圖指明的坐標位置就位,并應找平找正,設備要穩(wěn)定牢固,冷卻塔的出水管口及噴嘴方向、位置應正確。
During installation, it shall be in place according to the coordinate position indicated in the construction drawing, and shall be leveled and aligned. The equipment shall be stable and firm, and the direction and position of the water outlet and nozzle of the cooling tower shall be correct.
以上就是為大家介紹的有關生物脫硫的詳細的介紹,希望對您有所幫助.如果您有什么疑問的話,歡迎聯(lián)系我們.我們將以的態(tài)度,為您提供服務http://www.851323.com
The above is a detailed introduction of biological desulfurization for you. I hope it will be helpful to you. If you have any questions, please contact us. We will provide you with professional services http://www.851323.com

相關產(chǎn)品 我們的存在,是為了更好的服務于沼氣等可燃氣體凈化及利用行業(yè)
免费看美女被靠到爽的视频| 亚洲日韩国产成在线发布| 99精品免费久久久久久久久日本| 公车上把腿张开让农民工摸| 裸体跳舞xxxx裸体跳舞| 亚洲乱亚洲乱少妇无码99P| 亚洲区色情区激情区小说色情书| 国产又黄又猛又粗又爽的a片小说| 欧美一区二区三区成人片在线| 国产香港明星裸体xxxx视频| 中国人体艺术照片| 色偷偷色嚕噜狠狠网站| 欧美精品视频| 国产精品久久婷婷六月丁香| 与狐说by萝卜药丸了| 国产女明星裸体xxxx| 强开小娟嫩苞又嫩又紧视频播放| 国产婷婷色一区二区三区在线| 亚洲一区av无码少妇电影| 精品无人区一区二区三区在线| 我和小娻孑在卧室做了| 娇妻玩4p被三个男人伺候电影| 国产精品久久久久久麻豆一区| 免费观看又色又爽又黄的| chinese熟女老女人hd| 久久久久亚洲av成人网人人网站| 国精产品一品二品国精破解| 国产va免费精品观看| 成年美女黄网站色大片不卡| 国产精品无码麻豆放荡av| 啊灬啊灬快灬高潮了视频| 国产V片在线播放免费无码| 金瓶悔1一5扬思敏完整版| 欧美丰满大胆少妇xxxooo| 总裁把她的乳尖都吸大了| 日韩a片| 久久久久久精品免费免费WEI| 人与物videos另类xxxx| 香港三级台湾三级在线播放| 男男做爰猛烈高潮在线观看| 超碰国产精品久久国产精品99|